Both Date
and DateTime
support accessing of the year, month and day-of-month represented in the object, as well as related functionality such as calculating the day of the week.
Methods§
method year§
method year(Date: --> Int)
Returns the year of the date.
say Date.new('2015-12-31').year; # OUTPUT: «2015»say DateTime.new(date => Date.new('2015-12-24'), hour => 1).year; # OUTPUT: «2015»
method month§
method month(Date: --> Int)
Returns the month of the date (1..12).
say Date.new('2015-12-31').month; # OUTPUT: «12»say DateTime.new(date => Date.new('2015-12-24'), hour => 1).month; # OUTPUT: «12»
method day§
method day(Date: --> Int)
Returns the day of the month of the date (1..31).
say Date.new('2015-12-31').day; # OUTPUT: «31»say DateTime.new(date => Date.new('2015-12-24'), hour => 1).day; # OUTPUT: «24»
method formatter§
method formatter(Dateish:)
Returns the formatting function which is used for conversion to Str
. If none was provided at object construction, a default formatter is used. In that case the method will return a Callable type object.
The formatting function is called by DateTime method Str with the invocant as its only argument.
my = Date.new('2015-12-31'); # (no formatter specified)say .formatter.^name; # OUTPUT: «Callable»my = sub () ;= Date.new('2015-12-31', formatter => );say .formatter.^name; # OUTPUT: «Sub»say ; # OUTPUT: «12/31/2015»
method is-leap-year§
method is-leap-year(Dateish: --> Bool)
Returns True
if the year of the Dateish object is a leap year.
say DateTime.new(:year<2016>).is-leap-year; # OUTPUT: «True»say Date.new("1900-01-01").is-leap-year; # OUTPUT: «False»
method day-of-month§
method day-of-month(Date: --> Int)
Returns the day of the month of the date (1..31). Synonymous to the day
method.
say Date.new('2015-12-31').day-of-month; # OUTPUT: «31»say DateTime.new(date => Date.new('2015-12-24'), hour => 1).day-of-month; # OUTPUT: «24»
method day-of-week§
method day-of-week(Date: --> Int)
Returns the day of the week, where 1 is Monday, 2 is Tuesday and Sunday is 7.
say Date.new('2015-12-31').day-of-week; # OUTPUT: «4»say DateTime.new(date => Date.new('2015-12-24'), hour => 1).day-of-week; # OUTPUT: «4»
method day-of-year§
method day-of-year(Date: --> Int)
Returns the day of the year (1..366).
say Date.new('2015-12-31').day-of-year; # OUTPUT: «365»say DateTime.new(date => Date.new('2015-03-24'), hour => 1).day-of-year; # OUTPUT: «83»
method days-in-year§
method days-in-year(Dateish: --> Int)
Returns the number of days in the year represented by the Dateish object:
say Date.new("2016-01-02").days-in-year; # OUTPUT: «366»say DateTime.new(:year<2100>, :month<2>).days-in-year; # OUTPUT: «365»
Available as of the 2022.12 release of the Rakudo compiler.
method days-in-month§
method days-in-month(Dateish: --> Int)
Returns the number of days in the month represented by the Dateish object:
say Date.new("2016-01-02").days-in-month; # OUTPUT: «31»say DateTime.new(:year<10000>, :month<2>).days-in-month; # OUTPUT: «29»
method week§
method week()
Returns a list of two integers: the year, and the week number. This is because at the start or end of a year, the week may actually belong to the other year.
my (, ) = Date.new("2014-12-31").week;say ; # OUTPUT: «2015»say ; # OUTPUT: «1»say Date.new('2015-01-31').week; # OUTPUT: «(2015 5)»
method week-number§
method week-number(Date: --> Int)
Returns the week number (1..53) of the date specified by the invocant. The first week of the year is defined by ISO as the one which contains the fourth day of January. Thus, dates early in January often end up in the last week of the prior year, and similarly, the final few days of December may be placed in the first week of the next year.
say Date.new("2014-12-31").week-number; # OUTPUT: «1» (first week of 2015)say Date.new("2016-01-02").week-number; # OUTPUT: «53» (last week of 2015)
method week-year§
method week-year(Date: --> Int)
Returns the week year of the date specified by the invocant. Normally week-year
is equal to Date.year
. Note however that dates early in January often end up in the last week of the prior year, and similarly, the final few days of December may be placed in the first week of the next year.
say Date.new("2015-11-15").week-year; # OUTPUT: «2015»say Date.new("2014-12-31").week-year; # OUTPUT: «2015» (date belongs to the first week of 2015)say Date.new("2016-01-02").week-year; # OUTPUT: «2015» (date belongs to the last week of 2015)
method weekday-of-month§
method weekday-of-month(Date: --> Int)
Returns a number (1..5) indicating the number of times a particular day-of-week has occurred so far during that month, the day itself included.
say Date.new("2003-06-09").weekday-of-month; # OUTPUT: «2» (second Monday of the month)
method yyyy-mm-dd§
method yyyy-mm-dd(str = "-" --> Str)
Returns the date in YYYY-MM-DD
format (ISO 8601). The optional positional argument $sep
, which defaults to -
, is a one-character separator placed between the different parts of the date.
say Date.new("2015-11-15").yyyy-mm-dd; # OUTPUT: «2015-11-15»say DateTime.new(1470853583).yyyy-mm-dd; # OUTPUT: «2016-08-10»say Date.today.yyyy-mm-dd("/"); # OUTPUT: «2020/03/14»
method mm-dd-yyyy§
method mm-dd-yyyy(str = "-" --> Str)
Returns the date in MM-DD-YYYY
format (ISO 8601). The optional positional argument $sep
, which defaults to -
, is a one-character separator placed between the different parts of the date.
say Date.new("2015-11-15").mm-dd-yyyy; # OUTPUT: «11-15-2015»say DateTime.new(1470853583).mm-dd-yyyy; # OUTPUT: «08-10-2016»say Date.today.mm-dd-yyyy("/"); # OUTPUT: «03/14/2020»
method dd-mm-yyyy§
method dd-mm-yyyy(str = "-" --> Str)
Returns the date in DD-MM-YYYY
format (ISO 8601). The optional positional argument $sep
, which defaults to -
, is a one-character separator placed between the different parts of the date.
say Date.new("2015-11-15").dd-mm-yyyy; # OUTPUT: «15-11-2015»say DateTime.new(1470853583).dd-mm-yyyy; # OUTPUT: «10-08-2016»say Date.today.dd-mm-yyyy("/"); # OUTPUT: «14/03/2020»
method daycount§
method daycount(Dateish: --> Int)
Returns the number of days from the epoch Nov. 17, 1858, to the day of the invocant. The daycount returned by this method is the integral part of the Modified Julian Day (MJD) which is used routinely by astronomers, geodesists, scientists, and others. The MJD convention is designed to facilitate simplified chronological calculations. The fractional part of the MJD consists of the hours, minutes, and seconds of the using DateTime object converted to the equivalent fraction of 24 hours. Those two values added define the MJD of that instant.
say Date.new('1995-09-27').daycount; # OUTPUT: «49987»
method IO§
method IO(Dateish: --> IO::Path)
Returns an IO::Path
object representing the stringified value of the Dateish object:
Date.today.IO.say; # OUTPUT: «"2016-10-03".IO»DateTime.now.IO.say; # OUTPUT: «"2016-10-03T11:14:47.977994-04:00".IO»
PORTABILITY NOTE: some operating systems (e.g. Windows) do not permit colons (:
) in filenames, which would be present in IO::Path
created from a DateTime
object.
method earlier§
multi method earlier(Dateish: *)multi method earlier(Dateish: )
Returns an object based on the current one, but with a date delta towards the past applied. Unless the given unit is second
or seconds
, the given value will be converted to an Int
. See .later
for usage. It will generally be used through classes that implement this role, Date
or DateTime
my = Date.new('2015-02-27');say .earlier(month => 5).earlier(:2days); # OUTPUT: «2014-09-25»my = DateTime.new(date => Date.new('2015-02-27'));say .earlier(month => 1).earlier(:2days); # OUTPUT: «2015-01-25T00:00:00Z»
If the resultant time has value 60
for seconds, yet no leap second actually exists for that time, seconds will be set to 59
:
say DateTime.new('2008-12-31T23:59:60Z').earlier: :1day;# OUTPUT: «2008-12-30T23:59:59Z»
Negative offsets are allowed, though later is more idiomatic for that.
If you need to use more than one unit, you will need to build them into a List
of Pair
s to use the second form of the method:
say Date.new('2021-03-31').earlier( ( year => 3, month => 2, day => 8 ) ); # OUTPUT: «2018-01-23»
This feature was introduced in release 2021.02 of the Rakudo compiler.
method later§
multi method later(DateTime: *)
Returns an object based on the current one (belonging to any class that mixes this role in), but with a time delta applied. The time delta can be passed as a named argument where the argument name is the unit.
Unless the given unit is second
or seconds
, the given value will be converted to an Int
.
Allowed units are second
, seconds
, minute
, minutes
, hour
, hours
, day
, days
, week
, weeks
, month
, months
, year
, years
. Please note that the plural forms can only be used with the later
and earlier
methods.
The :2nd
form of colonpairs can be used as a compact and self-documenting way of specifying the delta:
say DateTime.new('2015-12-24T12:23:00Z').later(:2years);# OUTPUT: «2017-12-24T12:23:00Z»
Since addition of several different time units is not commutative, only one unit may be passed (and the first multi will be used).
my = DateTime.new(date => Date.new('2015-02-27'));say .later(month => 1).later(:2days); # OUTPUT: «2015-03-29T00:00:00Z»say .later(days => 2).later(:1month); # OUTPUT: «2015-04-01T00:00:00Z»say .later(days => 2).later(:month); # same, as +True === 1
You can also (since release 2021.02 of the Rakudo compiler) pass several units at the same time, but you will have to join them in a List
to activate the second form:
say DateTime.new(date => Date.new('2015-02-27')).later( (:1month, :2days) )# OUTPUT: «2015-03-29T00:00:00Z»
If the resultant time has value 60
for seconds, yet no leap second actually exists for that time, seconds will be set to 59
:
say DateTime.new('2008-12-31T23:59:60Z').later: :1day;# OUTPUT: «2009-01-01T23:59:59Z»
Negative offsets are allowed, though earlier is more idiomatic for that.
Objects of type Date
will behave in the same way:
my = Date.new('2015-02-27');say .later(month => 1).later(:2days); # OUTPUT: «2015-03-29»say .later(days => 2).later(:1month); # OUTPUT: «2015-04-01»say .later(days => 2).later(:month); # same, as +True === 1